The information on this page was correct at the time of the engagement event. The design of the flood protection scheme has evolved and may vary from the information provided on this page
Engagement Event No. 2
Following completion of the option appraisal process for the Grangemouth Flood Protection Scheme, engagement event no.2 took place on 28 and 30 May 2019. The event enabled residents / business owners and the public to view and comment on the preferred scheme for reducing the risk of flooding to Grangemouth and surrounding areas.
The purpose of the event was to:
-
Explain the preferred flood protection scheme option for Grangemouth and surrounding area,
-
Provide details of the next steps including an indicative programme,
-
Gauge and record the public reaction to the preferred scheme.
The boards displayed at the event can be viewed below:
The 3D animations below show schematically what the scheme may look like some 5-10 years after construction when vegetation and trees have regrown.