The information on this page was correct at the time of the engagement event. The design of the flood protection scheme has evolved and may vary from the information provided on this page

Engagement Event No. 2

Following completion of the option appraisal process for the Grangemouth Flood Protection Scheme, engagement event no.2 took place on 28 and 30 May 2019. The event enabled residents / business owners and the public to view and comment on the preferred scheme for reducing the risk of flooding to Grangemouth and surrounding areas.

 

The purpose of the event was to:

  • Explain the preferred flood protection scheme option for Grangemouth and surrounding area,

  • Provide details of the next steps including an indicative programme,

  • Gauge and record the public reaction to the preferred scheme.

 

The boards displayed at the event can be viewed below:

Consultation Slide 1

The 3D animations below show schematically what the scheme may look like some 5-10 years after construction when vegetation and trees have regrown.

PCE2
Consultation Event No. 2 - Zetland Park
00:48
Play Video
Consultation Event No. 2 - Grange Burn
01:28
Play Video
Consultation Event No. 2 - Stirling Road
00:48
Play Video
Consultation Event No. 2 - Dock Street
00:48
Play Video
Consultation Event No. 2 - Carron Bridges
00:48
Play Video
Consultation Event No. 2 - Chapel Burn
00:56
Play Video

Post Event Report

Following the engagement event a report was compiled to summarise the events and record the views of those who completed the feedback questionnaire and/ or provided comments. The report can be accessed by clicking on the icon below: